PTCE · FAQ · Patient Safety and Quality Assurance
How do near miss, RCA, and CQI show up on the exam?
Knowledge Area 3.4 groups near miss, root-cause analysis (RCA), and continuous quality improvement (CQI) with other event-reporting procedures. A near miss is an error that was caught before it reached the patient. RCA looks for system causes. CQI is the ongoing process of measuring and improving those systems.
PTCB PTCE Content Outline (effective January 2026), Knowledge Area 3.4
Same domain
- What are high-alert and LASA medications on the PTCE?
- Why does Tall Man lettering appear on the PTCE?
- Which error-prevention strategies are in the current outline?
- When must a technician involve the pharmacist?
- Can a technician recommend an OTC product?
- What is MedWatch and when is it used?
- What is VAERS on the PTCE?
- What types of prescription errors does the PTCE name?
- What infection-prevention steps are on the PTCE?