How does the 120% allowance limit a load-side PV breaker?
On a load-side connection, 120% of the bus rating must cover the main breaker plus the PV breaker. A 200 A bus with a 200 A main leaves 40 A for PV. If that breaker is too small and the load calculation will not allow a smaller main, a supply-side connection is one remaining path, subject to the service equipment and the utility. Field Guide teaches the arithmetic as a draft drill. The adopted NEC edition and the utility’s interconnection rule decide the job.